Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2021 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 11/10/2021 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Hydro test on pipe failed. There was a small leak that dropped the pressure. Fix leak and re-test. The layout of the sprinkler pipe is appropriate. The heads in the center dropped ceiling area will need to be adjusted by final inspection, after the chandelier is in place. |