Permit: T21FC00615

Parcel: 12513068A

Inspection Status: Approved

Inspection History: FIRE SPKLR - OH PIPING & HYDRO

Permit Number - T21FC00615

Inspection Description - FIRE SPKLR - OH PIPING & HYDRO

Inspection Status - Approved

Date Description Inspector Results Comments
07/21/2022 FIRE SPKLR - OH PIPING & HYDRO Approved
05/02/2022 FIRE SPKLR - OH PIPING & HYDRO Partial Approval OH/Hydro for North side of Chapel lower level sprinkler heads, and back rooms behind Chapel. 225psi.
02/09/2022 FIRE SPKLR - OH PIPING & HYDRO Partial Approval -3rd floor approved
-1st floor everything except the north wing and chapel is approved.
01/26/2022 FIRE SPKLR - OH PIPING & HYDRO Partial Approval -2nd floor completed
11/03/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 3 - 1st floor south wing, front exterior porch & portion of middle area,
10/05/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 2 - 2nd floor, south and middle wings approved.
09/24/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval This was actually an UG hydro inspection for the FDC fireline.
205PSI
A permit is required. Maximum is submitting plans and pulling a permit
08/25/2021 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Inspection 1- Basement level approved