Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
Permit Number - T21FC00615
Inspection Description - FIRE SPKLR - OH PIPING & HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/21/2022 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
05/02/2022 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | OH/Hydro for North side of Chapel lower level sprinkler heads, and back rooms behind Chapel. 225psi. | |
02/09/2022 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | -3rd floor approved -1st floor everything except the north wing and chapel is approved. |
|
01/26/2022 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | -2nd floor completed | |
11/03/2021 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 3 - 1st floor south wing, front exterior porch & portion of middle area, | |
10/05/2021 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 2 - 2nd floor, south and middle wings approved. | |
09/24/2021 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | This was actually an UG hydro inspection for the FDC fireline. 205PSI A permit is required. Maximum is submitting plans and pulling a permit |
|
08/25/2021 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Inspection 1- Basement level approved |