Inspection Status: Canceled
Inspection History: COT - FCON - Sprinkler - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2022 |
COT - FCON - Sprinkler - Final |
|
Canceled |
Inspection Canceled |
| 01/28/2022 |
COT - FCON - Sprinkler - Final |
wmotto1 |
Partial Approval |
Entered by WMOTTO1 - Water flow and Tamper passed. first floor approved. Walked and checked sprinkler head placement everything was installed to code.
2. Everything has passed inspection just need the evevator to be installed before the sprinkler head can be inspected in the shaft. |