Inspection Status: Passed
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 10/05/2022 |
FCON – OH Piping & Hydro |
CBASALDUA |
Approved |
Entered by CBASALD1 - -3rd floor and penthouse 225psi |
| 09/15/2022 |
FCON – OH Piping & Hydro |
CBASALDUA |
Partial Approval |
Entered by CBASALD1 - -2nd floor 225psi
-East Standpipe 230psi
-West Standpipe 225psi |
| 04/14/2022 |
FCON – OH Piping & Hydro |
CBASALDUA |
Partial Approval |
Entered by CBASALD1 - -Basement 215 psi
-1st floor 235 psi |
| 04/12/2022 |
FCON – OH Piping & Hydro |
JPEELDAVIS |
Cancelled |
Entered by JPEELDA1 - to re-open the permit |