Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T21FC00104
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/13/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | Hydro test completed on 12" supply line. 200 psi |
|
06/22/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Cancelled | ||
06/16/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | 7th inspection - visual inspection of the 12" supply pipe from the valve in the parking lot to the pump room. Ok to backfull pipe. *Note-Hydro test @ 200psi still needed. |
|
05/25/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | 6th inspection - All the 10" line around the building has benn hydro tested. This supplies the hydrants as well as the 4 interior risers. The 12" supply line to the pump still needs to be installed and then tested. All lines still need to be flushed. |
|
05/12/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | 5th inspection Tie in on SW corner of building and 50' run on west side of building OK to backfill |
|
04/23/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Observed fire line on south side of building approx. 300'. Observed 50' on west side of buildind. Pressure test will take place after line is buried They have had 4 inspections. |
|
03/16/2021 | FIRE SPKLR - UG, PIPING, HYDRO | Not ready for Inspection | 1ST inspection. UG not under pressure |