Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/30/2021 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
ON SITE; THERE IS ACTIVE HOT WATER TO BUILDING VERIFIED BY INSPECTOR. THE ENTIRE COMPLEX IS ON A CHILLER SYSTEM AND ONLY HAS TWO SETTINGS, COOLING AND HEATING. THESE SETTINGS ARE CHANGED OVER TWICE A YEAR. COOLING FOR SUMMER AND HEATING FOR WINTER. DATES THEY CHANGE THEIR SYSTEM OVER IS NOT A VIOLATION. WILL CLOSE CASE AT THIS TIME, NO VERIFY ON REPORTED VIOLATIONS. |