Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T21DV05880
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/09/2021 | INSP - INITIAL CODE ENFORCMENT | Approved | ONSITE INSPECTION UNPERMITTED WORK WAS IDENTIFIED AND A STOP WORK ORDER WAS ISSUED AND POSTED ON THE PROPERTY. THE EXTERIOR OF THE DWELLING HAS NEW WINDOWS BUT UNABLE TO DETERMINE IF WINDOW OPENING SIZE HAS CHANGED. THE FRONT AND REAR ADDITIONS RECORDED IN 1972 HAVE FOAM PAD WITH A STUCCO FINISH. THE INTERIOR FLOOR PLAN HAS CHANGED, BATHROOMS HAVE BEEN ENLARGED, BEDROOM CLOSETS HAVE BEEN REMOVED. NEW SHEETROCK HAS BEEN INSTALLED IN ALL ROOMS, WALLS AND CEILINGS. THERE IS NEW ELECTRICAL BOXES ANDS WIRING IN ALL ROOMS, WALLS AND CEILINGS. THERE IS A NEW SEWER AND DRAIN WASTE SYSTEM INSTALLED, THE EXTERIOR HAS OVER 20 FEET OF NEW SEWER PIPE 4 INCH PENETRATING THE FOUNDATION ONTO THE INTERIOR OF TWO BATHROOMS LOCATIONS. THE INTERIOR BATHROOM CONCRETE FLOOR SHOW THE CUT OUTS WHERE THE SEWER PIPE TRAVELS AND WAS COVER WITH CEMENT. WATER CLOSETS HAVE BEEN INSTALLED ALONG WITH THE SHOWER DRAINS, THERE ARE NEW COPPER STUB OUTS FOR THE SINKS AND SHOWER VALVE ALSO INSTALLED. THERE IS A NEW GAS FIRE WATER HEATER INSIDE THE DWELLING. THERE NEW FLEX DUCT WORK WITH REGISTERS INSTALLED IN ALL ROOMS, THE ROOF HAS A NEW SHEET METAL STAND FOR THE HVAC UNIT THE STOP WORK ORDER WAS POSTED, SPOKE WITH KMS REP AND WORKERS WERE ORDERED OFF THE PROPERTY. |