Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2021 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, MET WITH THE MANAGER, SHE ASKED IF SHE COULD CALL IN MAINTANENCE, MANINTANENCE DID COME TO THE OFFICE. THEY INFORMED ME THAT THERE WAS A FLOOD ON WEDNESDAY NIGHT, THE AREA SURROUNDING THE COMPLEX WAS JUST SATUARATED EVEN THOUGH THERE IS A GROUND DRAIN THAT THAT IS SUPPOSE TO HELP WITH OVER FLOW AND MOVE WATER FROM THE AREA. WATER ENTERED ALL THE UNITS IN COMPLEX #7. WATER EXTRACTION WAS CONTACTED ( TOP NOTCH FLOOR CARE) AND EXTRACTION BEGAN ON THURSDAY MORNING, WHEN EXTRACTION WAS COMPLETED THE CARPETS WERE PULLED BACK AND BLOWERS PLACED IN THE UNITS TO HELP DRY. SOME OF THE UNITS HAD BASEBOARD REMOVED AND DRYWALL CUT UP 6 INCHES AWAY FROM THE FLOOR. EXTRACTION COMPANY WAS BACK TODAY TRYING TO CLEAN AND SANITIZE THE UNITS. THIS PARTICULAR UNIT HAS BEEN SCHEDULED TO BE PLACED IN A DIFFERENT UNIT. MAINTANENCE IS TRYING TO PREPARE UNIT FOR OCCUPANTS TO MOVE IN, THE ONLY DELAY AT THIS TIME. I INFORMED OCCUPANT TO STAY ON TOP OF MANAGEMENT TO GET THEM MOVED. RELCON CONST HAS BEEN CONTACTED TO GIVE THEM A BID TO ADD A SUMP PUMP TO THE GROUND DRAIN TO HELP MOVE THE WATER OUT OF THE FLOODED AREA. ALL ISSUES ARE BEING ADDRESSED. ALL WORK IS IN PROGRESS AND OCCUPANTS WILL BE ABLE TO MOVE. COMPLIANCE / CLOSE CASE. |