Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T21DV04430
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2021 | INSP - INITIAL CODE ENFORCMENT | Approved | I VISTED THE SITE, WENT DIRECTLY TO THE OFFICE, SPOKE WITH MANAGEMENT WHO INFORMED ME THAT THEY HAD A 2 1/2 INCH WATER MAIN IN THE PARK BREAK NEXT TO TRAILER #13 AND HAD TO SHUT THE WATER OFF TO THE PARK. INSIDE THE OFFICE I FOUND PALLETS OF BOTTLED WATER AND 1 GALLON JUGS OF WATER. THE MANAGER HAD PLACED THE SITUATION ON LINE AND STATED THAT OCCUPANTS KNOW TO CHECK THE ON LINE SERVICE IF THERE IS A EMERGENCY. UNIT #94 WAS DIRECTLY ACROSS FROM THE OFFICE. WE WALKED OVER AND TOOK THE OCCUPANT A CASE OF WATER. MANAGEMENT HAS TAKEN EVERYONE WHO CALLS AND NEEDS WATER EITHER JUGS OR CASES OF WATER. I DROVE OVER TO SPACE #13, SPOKE TO THE PLUMBING COMPANY WHO INFORMED ME THAT ORIGINAL ASBESTOS PIPE HAD BROKE, WATER WAS TURNED OFF AT THE MAIN AND ENTIRE PARK NEEDED TO BE SHUT OFF. THE SLIP FITTINGS THEY NEEDED HAD JUST ARRIVED THEY WERE ALSO GOING TO ADD A SHUT OFF VALVE IN THE AREA IN CASE THIS WERE TO HAPPEN IN THE FUTURE THEY WOULD NOT NEED TO SHUT THE ENTIRE PARK DOWN. PLUMBER ESTIMATED THE TIME OF COMPLETION WOULD BE AROUND 12:00. I RECEIVED A CALL FROM MAINTANENCE AROUND 12:20 INFORMING ME THAT THE REPAIRS WERE COMPLETED AND WATER HAD BEEN TURNED BACK ON WITH NO ISSUES. THEY ALSO CONTACTED TURNER LABRATORIES WHO CAME OUT AND TESTED THE WATER AND RESULTS WOULD BE BACK WITHIN 72 HRS. I CONTACTED MARTIN AND UPDATED HIM ON THE SITUATION. C/E HAS NO FURTHER ISSUES. COMPLIANCE / CLOSE CASE. |