Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2021 | INSP - INITIAL CODE ENFORCMENT | Approved | ON SITE; UNPON ARRIVAL INSPECTOR FINDS WORK BEING DONE TO DWELLING, THE REAR PORCH HAS BEEN ENCLOSED BY FRAME WORK. SPOKE WITH LEAD PERSON MIKE WHO CONTACTED OWNER FOR PERMIT INFORMATION. INSPECTOR FOUND NO PERMITS ISSUED FOR THE ADDRESS AND WORK BEING DONE. THE EXTENT OF THE WORK DONE WILL REQUIRE A FULL SET OF PLANS FOR ELECTRICAL, MECHANICAL, PLUMBING AND STRUCTURAL TO INCLUDE NEW FLOOR PLAN. INSPECTOR FOUND THE FOLLOWING; INTERIOR WALLS REMOVED, NEW DOOR ENTRANCES MADE THROUGH EXISTING ADOBE WALLS, FOUND HEADERS PLACED OVER NEW DOOR ENTRANCES THAT MAY BE STEEL. DWELLING HAS BEEN SPLIT INTO A DUPLEX UNIT A AND B. FRAME WORK ADDED TO ALL OF THE INTERIOR, TAKING AWAY SQUARE FOOTAGE, CHANGING THE ENTIRE FLOOR PLAN. A COMPLETE REMODEL OF EXISTING. ELECTRICAL UPGRADES FOUND, ALL NEW ELECTRIC WIRING IN WOOD FRAMES AND IN CEILING AREAS WITH METAL CONDUIT AND JUNCTION BOXES INSTALLED, ALSO ADDED NEW WIRING INTO EXISTING ADOBE WALLS THAT HAVE BEEN REFINISHED BY WHAT LOOKS LIKE CEMENT OR STUCCO. WINDOWS ARE BEING REMOVED AND REFINISHED TO THE EXISITING ADOBE WALLS ALSO BEING COVERED UP WITH CEMENT OR STUCCO. NEW ELECTRICAL PANELS FOUND ON BOTH SIDES OF THE NOW DUPLEX, EXPOSED WIRING THROUGHOUT. ALL NEW PLUMBING ADDED TO THE NEWLY ENCLOSED ADDITIONS IN REAR PORCH. BOTH UNITS NOW HAVE NEW PLUMBING INSTALLED FOR STAND UP SHOWERS, BATH SINKS AND TOILETS, NEW PLUMBING FOR BOTH UNITS FOR LAUNDRY HOOK UPS AND DRYER VENTS INSTALLED IN NEW WALL ENCLOSURES. NEW ROOF WITH NEW VENTING DUCTS AND PIPES. FULL MECHANICAL UPGRADES FOR WATER HEATERS, A/C AND HEAT. ALL NEW DUCT WORK FOUND. NEW EXTERIOR WALLS HAVE BEEN STUCCOED. NEW ENTRY WAYS INSTALLED FOR BOTH UNITS. LEAD MAN MIKE SPOKE TO CONTRACTOR JIM WHO HAS BEEN NOTIFIED TO CEASE ALL WORK TODAY AS THERE ARE NO PERMITS FOUND FOR ANY OF THE WORK BEING DONE. HE IS TO OBTAIN PROPER PERMITS PRIOR TO FINISHING ANY WORK. INSPECTOR WILL SEND NOTICE OF VIOLATION TO LISTED OWNER AND WILL CONTACT JIM TO SEND HIM A COPY AS WELL. 30 DAYS TO COMPLY. |