Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Roof NailingĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSBU - Roof NailingĀ | Canceled | Inspection Canceled | |
| 03/11/2025 | COT - RSBU - Roof NailingĀ | Re-inspection required | 2-5-25, provide a set of approved plans, firefoam all penetrations at top plate, missing"knockout" at subpanel, label all breakers, and install electrical covers for all receptacles. With regards to covered construction, provide a letter from a licensed contractor indicating that all covered construction was done per approved plans/ per the 2018 International Residential Code. If not possible, then covered construction would have to be uncovered to verify code compliance. 11 March 25 1. Same notes as above, no plans on site. Customer will submit for approval. |