Permit: T21CM09776

Parcel: 140260390

Inspection Status: Not Ready

Inspection History: COT - LCPL - Sewer 

Permit Number - T21CM09776

Inspection Description - COT - LCPL - Sewer 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Sewer  Not Ready
02/07/2025 COT - LCPL - Sewer  Partial Pass 2/7/25: partial pass for underground sewer 200' run ok to backfill at risk. Pressure test will be conducted once sewer system is complete
02/11/2025 COT - LCPL - Sewer  Partial Pass 2/7/25: partial pass for underground sewer 200' run ok to backfill at risk. Pressure test will be conducted once sewer system is complete
2/11/25: partial pass for underground sewer north end of project 450'. Backfill at risk shading required. Air pressure test required
02/12/2025 COT - LCPL - Sewer  Partial Pass 2-12-25, partial pass for underground sewer approximately 100 ft run on northwest quad- backfill at own risk. Air pressure required once sewer system is complete.
02/13/2025 COT - LCPL - Sewer  Partial Pass 2/7/25: partial pass for underground sewer 200' run ok to backfill at risk. Pressure test will be conducted once sewer system is complete
2/11/25: partial pass for underground sewer north end of project 450'. Backfill at risk shading required. Air pressure test required
2-12-25, partial pass for underground sewer approximately 100 ft run on northwest quad- backfill at own risk. Air pressure required once sewer system is complete.
2/13/25: sewer run complete. backfill at own risk. Air pressure required
12/11/2025 COT - LCPL - Sewer  Passed 12-11-25: air test verified on entire sewer run at 4psi.