Permit: T21CM09776

Parcel: 140260390

Inspection Status: Not Ready

Inspection History: COT - LCPL - Rough Soil 

Permit Number - T21CM09776

Inspection Description - COT - LCPL - Rough Soil 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Rough Soil  Not Ready
02/21/2025 COT - LCPL - Rough Soil  Partial Pass 2-21-25, approximately 700 feet of underground plumbing on south end of pad verified under test and per approved plans. Okay to backfill progress areas and continue with construction.
03/06/2025 COT - LCPL - Rough Soil  Partial Pass 3-6-25, plumbing underground per plan at grid line a-b#1-8. Okay to backfill with shading materials.
03/11/2025 COT - LCPL - Rough Soil  Partial Pass 2-21-25, approximately 700 feet of underground plumbing on south end of pad verified under test and per approved plans. Okay to backfill progress areas and continue with construction.
3-6-25, plumbing underground per plan at grid line a-b#1-8. Okay to backfill with shading materials.
3/11/25: plumbing underground per plan at GL A-D/1-6. Ok to backfill shading required
11/10/2025 COT - LCPL - Rough Soil  Passed 11-10-25: approved.