Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2022 | EXT METAL CLIPS/EXT SHEATHING | Approved | AP | |
| 01/31/2022 | EXT METAL CLIPS/EXT SHEATHING | Correction Required | CO 1. Relieve all nails into bottom cord of trusses until roof is loaded 2. Shear wall detail not per detail 14 on page SD1.3c, condition A 3. Approximately 12 anchor bolts are missing at 1st floor shear walls. |