Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2022 | ELECTRIC - INTERMEDIATE | Approved | Ap Trans to 600 Amp disco 600 Amp disco to low voltage HE HEV to J box to chargers All the above ok |
|
| 02/25/2022 | ELECTRIC - INTERMEDIATE | Partial Approval | Partial, 2-3 1/2” raceways installed from service to EV panel location. |