Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2022 | ELECTRIC - UNDERGROUND | Approved | Ap Close permit |
|
| 02/25/2022 | ELECTRIC - UNDERGROUND | Not ready for Inspection | Not Ready | |
| 01/31/2022 | ELECTRIC - UNDERGROUND | Partial Approval | pa Core drilled from charger stations SE 130’ to building location, for 3 - 1 1/2” conduits. Core drilled from building feed location (same as above) to the NW 160’ to turn box. Then SW 160’ to next box, for 2 1/2” red conduit. All runs ok. |