Inspection History Details
Inspection Status: Approved
Inspection History: RESIDENTIAL INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2022 | RESIDENTIAL INTERMEDIATE | Approved | Approved | |
| 03/10/2022 | RESIDENTIAL INTERMEDIATE | Partial Approval | Partial approval, 5. Seal top of chase around duct, missing blocking at st stairway , fresh air intake to close to sewer vent | |
| 03/07/2022 | RESIDENTIAL INTERMEDIATE | Correction Required | CO 1. Block all resisters 2. Support all 3-4” ABS at 90 degree turns 3. Extend gas line into washer box, secure gas line, retest 4. Complete exhaust duct in master bath 5. Seal top of chase around duct 6. Complete exhaust at dryer box 7. Complete HVAC duct to register in upstairs bathroom 8. Secure toilet flange to floor |
|
| 03/03/2022 | RESIDENTIAL INTERMEDIATE | Cancelled | Inspection canceled by contractor |