Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2022 | FRAMING | Approved | AP | |
| 02/23/2022 | FRAMING | Correction Required | CO 1. A35 at shear wall require 12 nails each 2. Complete foam and lath around window at patio. 3. Install lot & address signs at all houses under construction. |
|
| 02/22/2022 | FRAMING | Cancelled | CA per Dave Eno. Cancel all other inspections. | |
| 02/18/2022 | FRAMING | Correction Required | CO shear wall not connected to truss blocking per detail |