Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
| 10/10/2023 | COT - LCBU - Building Final | Re-inspection required | 10137: bedroom hot at all times. Check half-hot receptacle. Re label panel. 10139: insulate pipes under neath kitchen sink. Cover for HVAC. Secure dishwasher. Cover plate under sink 10137: insulate pipes underneath kitchen sink 10237: exhaust fan. Extend switch plate at bathroom. Check half-hot at bedroom. Heck receptacle at pony wall. 10239 re label panel. Check half-hot receptacle at bedroom. Bedroom north side has open ground. Check all whips at room. Receptacle not working. Existing receptacle is not wired correctly. Provide WR receptacle along with a bubble cover. Level out and secure condenser units. 10/10/2023 |
|
| 10/17/2023 | COT - LCBU - Building Final | Passed |