Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCME - Mechanical Final
Permit Number - T21CM07854
Inspection Description - COT - LCME - Mechanical Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCME - Mechanical Final | Not Ready | ||
| 08/31/2023 | COT - LCME - Mechanical Final | Partial Pass | 8/31/23: units 8132, 8131, 8129, and 8130 have AC units that are being over Amped by 30Amp fuses ( Max fuse is 25Amp), secure all electrical whips at rooftop AC units, AC units need condensate piping to be coated to prevent sun damage, All refrigerant lines on units 8129,8130,8131,8132 need to be coated to prevent sun damage on insulation. Receptacle on roof top needs to be WR and be provided with Weather cover, Junction box at roof top needs cover, Unit 3230 is missing cover at disconnect box, remove all excess conduit and wires on roof top. | |
| 10/10/2023 | COT - LCME - Mechanical Final | Canceled | Canceled per contractor. 10/10/2023 | |
| 10/17/2023 | COT - LCME - Mechanical Final | Passed |