Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | Not Ready | ||
| 01/13/2023 | COT - LCPL - Plumbing Intermediate | Re-inspection required | toilet stub-out not secured and top plates not fire stopped pex imbedded in plaster needs protected with the proper gauge steel |
|
| 01/18/2023 | COT - LCPL - Plumbing Intermediate | Passed | Plumbing rough-in is complete. |