Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2022 | ELECTRIC - FINAL | Approved | Approved. The TEP clearance code is DGC. | |
| 03/17/2022 | ELECTRIC - FINAL | Approved | -AP Sent text at 8:10 Field 10-12 CONTACTS: Solgen Power - (520) 365-2502 ,(520) 365-2502 CONTRACTOR: Solgen Power ((520) 365-2502- (520) 365-2502), OWNER : April Alegria ((520) 390-1424, (520) 390-1424) |
|
| 03/15/2022 | ELECTRIC - FINAL | Cancelled | CA Contractor did not leave a message or phone number. Canceled at 1:35 pm. |
|
| 02/04/2022 | ELECTRIC - FINAL | Denied | DE. Provide ladder for roof access. Field 10-12 9:29; contact number is invalid. 11:14; no answer at door. |
|
| 01/28/2022 | ELECTRIC - FINAL | Cancelled | Inspection canceled no call back | |
| 12/21/2021 | ELECTRIC - FINAL | Partial Approval | SOLAR PANEL REMAINING. |