Inspection Status: Passed
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 05/03/2022 |
COT - RSPL - Rough Soil |
DMUNIZ |
Approved |
Entered by DMUNIZ1 - |
| 05/02/2022 |
COT - RSPL - Rough Soil |
TLUNDBERG |
Correction Required |
Entered by NGARCIA3 - CO
Install trace wire on sewer pipe
|
| 04/29/2022 |
COT - RSPL - Rough Soil |
TLUNDBERG |
Correction Required |
Entered by VVERA1 - CO
1. Approved plans are not on site.
2. No water in stack
3. Install trace wire on sewer pipe and extend to top of clean out
4. Support entire length of pipe
|
| 04/28/2022 |
COT - RSPL - Rough Soil |
TLUNDBERG |
Cancelled |
Entered by NGARCIA3 - CA per Cynthia |