Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T21CM07444
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2022 | BUILDING - FINAL | Approved | Approved | |
09/21/2022 | BUILDING - FINAL | Denied | Denied. Per previous notes | |
09/02/2022 | BUILDING - FINAL | Denied | DE 1. Open slot in main panel 2. Label sub-panel breaker 3. Label all breakers in sub-panel 4. Exterior outlet required to be WR 5. Lights, outlets, and smoke detectors required to be arc-fault protected 6. Install a smoke detector outside of bedrooms 7. Cut clean-outs to grade and glue on threaded caps 8. Remove the flexible drain under vanity sink. 9. Hot/cold lines reversed at bathroom vanity 10. Provide the manufactures specs on insta-hot water heater 11. Wrap exterior water lines with min R-3 insulation |