Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2022 | FIRE - FINAL | Approved | ||
| 04/13/2022 | FIRE - FINAL | Partial Approval | 1. All items have been corrected and passed. Ok for TCO per tucson fire ok to occupy. 2. Need knox box to replace the supra box before this can be finaled. |
|
| 04/07/2022 | FIRE - FINAL | Cancelled | not ready | |
| 02/23/2022 | FIRE - FINAL | Denied | -Sprinkler system needs modification, new walk in cooler needs sprinkler head. -Kitchen hood needs service and inspection report. -Fire alarm system needs annual inspection -Need fire extinguishers -Celings needs to be installed -Need to test EMs and exit signs -Operational permit required through TFD - application left on site -Post maximum occupancy sign -Need to complete CO2 alarm system ***Stopped inspection** complete all items and recalll when ready. |