Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
Permit Number - T21CM06923
Inspection Description - COT - LCBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
02/01/2024 | COT - LCBU - Building Final | Passed | Contact Joe 520-451-3574 30 minutes ahead | |
08/03/2023 | COT - LCBU - Building Final | Re-inspection required | 8/3/23: 1. Install permanent address numbers. 2. Clean and remove all construction debris front & rear. 3. ADA horizontal grab bar exceeds 36" max from floor. 4. Water closet exceeds 18" from wall. 5. Install toilet paper holder per plan. 6. Wrap drain pipes & water lines under sink. 7. Mirror exceed 40" from floor. 8. Submit water chlorination report thru portal. 9. Install all door hardware. 10. Waiting on Fire Dept final. 11. Identify all roof mounted units per panel schedule and verity correct fuse for each unit. | |
08/28/2023 | COT - LCBU - Building Final | Partial Pass | 8/3/23: 1. Install permanent address numbers. 2. Clean and remove all construction debris front & rear. 3. ADA horizontal grab bar exceeds 36" max from floor. 4. Water closet exceeds 18" from wall. 5. Install toilet paper holder per plan. 6. Wrap drain pipes & water lines under sink. 7. Mirror exceed 40" from floor. 8. Submit water chlorination report thru portal. 9. Install all door hardware. 10. Waiting on Fire Dept final. 11. Identify all roof mounted units per panel schedule and verity correct fuse for each unit. 8/28/23: waiting on restroom partitions to be installed. OK to issue a TCO Level 4. |
|
12/04/2023 | COT - LCBU - Building Final | Not Ready | 12/4/23: submit all changes to the plans for this TI for a new plan review. All revisions are required to be approved before Building Final is approved. |