Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2022 | FIRE - FINAL | Approved | -Remove sprinkler head from outside front door covered entry | |
| 02/25/2022 | FIRE - FINAL | Not ready for Inspection | 1. Need to remove all sprinkler heads from the building. The system is a dead system and sprinklers are not required. 2. Remove keyed lock from enterior doors. Remove latch lock from door on south end. |