Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2022 | ELECTRIC - FINAL | Approved | Approved, please send DGC Clearance to TEP for the solar meter (RECN clearance was called into TEP for the power-kill reconnection) |