Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T21CM04891

Parcel: 130171520


Addresses:

4062 E SYLVANE DR


Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Permit Number - T21CM04891

Inspection Description - COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/06/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Re-inspection required 1-6-25-carport extension was constructed without permits or inspections. Plans to the city have since been submitted and approved. Customer advised that he is required to excavate the footers so we may verify depth/width, and make corrections to carport that reflect what's is on plans. I noted missing or wrong straps on beams to posts, incorrect sized straps/nails from concrete piers to base of posts,missing blocking throughput,and cmu firewall has not been erected. Customer also informed that any additional covered construction may require a letter from a contractor documenting that build meets or exceeds the 2018 IRC requirements. In that case, the city would review and ultimately determine whether the work is acceptable.
04/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Partial Pass 1-6-25-carport extension was constructed without permits or inspections. Plans to the city have since been submitted and approved. Customer advised that he is required to excavate the footers so we may verify depth/width, and make corrections to carport that reflect what's is on plans. I noted missing or wrong straps on beams to posts, incorrect sized straps/nails from concrete piers to base of posts,missing blocking throughput,and cmu firewall has not been erected. Customer also informed that any additional covered construction may require a letter from a contractor documenting that build meets or exceeds the 2018 IRC requirements. In that case, the city would review and ultimately determine whether the work is acceptable.
4/28/25: framing per plan at fire wall. Pending food framing addition of beams