Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Firewall/Fire Barrier/Firestop
Permit Number - T21CM04891
Inspection Description - COT - RSBU - Firewall/Fire Barrier/Firestop
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Re-inspection required | 1-6-25-carport extension was constructed without permits or inspections. Plans to the city have since been submitted and approved. Customer advised that he is required to excavate the footers so we may verify depth/width, and make corrections to carport that reflect what's is on plans. I noted missing or wrong straps on beams to posts, incorrect sized straps/nails from concrete piers to base of posts,missing blocking throughput,and cmu firewall has not been erected. Customer also informed that any additional covered construction may require a letter from a contractor documenting that build meets or exceeds the 2018 IRC requirements. In that case, the city would review and ultimately determine whether the work is acceptable. | |
| 04/28/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Partial Pass | 1-6-25-carport extension was constructed without permits or inspections. Plans to the city have since been submitted and approved. Customer advised that he is required to excavate the footers so we may verify depth/width, and make corrections to carport that reflect what's is on plans. I noted missing or wrong straps on beams to posts, incorrect sized straps/nails from concrete piers to base of posts,missing blocking throughput,and cmu firewall has not been erected. Customer also informed that any additional covered construction may require a letter from a contractor documenting that build meets or exceeds the 2018 IRC requirements. In that case, the city would review and ultimately determine whether the work is acceptable. 4/28/25: framing per plan at fire wall. Pending food framing addition of beams |