Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T21CM04263

Parcel: 133554220

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
04/22/2022 ELECTRIC - FINAL Approved Approved. The TEP clearance code is DGC.
04/12/2022 ELECTRIC - FINAL Denied DE. Approved plans show a 70 amp solar breaker for a 200 amp service. Actual buss rating is 200 amps per sticker. Additionally, Four Tesla power walls are installed, back-feeding through three separate panels, by a separate permit. Plans need review and revision by an EE to coordinate all of the above work.