Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2022 | FRAMING | Approved | AP | |
| 01/28/2022 | FRAMING | Partial Approval | PA. Observed ext drywall on added porch. No access to records electronically at this time. Note: Plans call for 5/8” type X on both sides of wall at PL. Drywall is not type X, however 1-1/2” solid masonry will be provided on exterior side. This provides equivalent protection of 1hr rating per Code requirements. | |
| 01/26/2022 | FRAMING | Denied | DE. Unable to connect with contractor for inspection. | |
| 01/21/2022 | FRAMING | Partial Approval | PA. Observed pad footing for porch addition, framing of wall and roof for porch addition, and framing/ Electric prior to shear of walls at existing porch. Field 12-2 Sent text informing of ETA at9:19 CONTACTS: SLB Construction Inc - (520) 940-5690 ,(520) 940-5690 CONTRACTOR: SLB Construction Inc ((520) 940-5691- (520) 940-5691), OWNER : Julie Darling ((520) 471-7565, (520) 471-7565), CONTACT : Onsite Contact ((520) 940-5690, (520) 940-5690), |
|
| 01/03/2022 | FRAMING | Partial Approval | Partial approval ok T&G rear patio |