Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/22/2022 | BUILDING - FINAL | Approved | Approved | |
| 03/18/2022 | BUILDING - FINAL | Correction Required | CO 1. Label all breakers 2. 3 feet deep landing required at new door 3. Paint/stain all exterior wood 4. Replace flexible pipe under lavatory with smooth bore pipe 5. Install hose bib at west wall. |