Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2021 |
PLUMBING - ROUGH, SOIL |
|
Approved |
-AP |
| 07/26/2021 |
PLUMBING - ROUGH, SOIL |
|
Denied |
DE 1-Plumbing corrections are completed; however approved building plans show addition four feet from property line, and forms are 12-16 inches from property line. |
| 07/21/2021 |
PLUMBING - ROUGH, SOIL |
|
Denied |
DE. 1-Provide approved plans. 2-Clean out fittings need to direct waste in the direction of flow. 3-Lav connection to branch drain is vent fitting. 4-Toilet connection to branch drain is vent fitting. 5-Vent connection at toilet is not above the centerline of drain. 6-Connect branch drain to building drain. 7-Provide water test of DWV piping. |