Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | BULD - Electrical Clearance | Passed | Approved 3-phase 800A service panel upgrade - INCR Clearance to TEP is required for the overhead transformer connection |