Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2021 | ELECTRIC - CABLE DROP | Approved | Ap Called TEP at 750 - 3 phase from 2 - underground to overhead Clear incr |