Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 09/16/2022 | ENGR Engineering Final | LMakus | Partial Approval | Entered by LMAKUS1 - Engineering has no objection to a Temporary Certificate of Occupancy. |
| 04/02/2024 | ENGR Engineering Final | Not Ready | water harvesting basins need installation for Phase I development | |
| 05/11/2023 | ENGR Engineering Final | Not Ready | engineering requires completion of the development package permit prior to final for this building. Work has been completed for phase 1 only at this time |
|
| 05/12/2023 | ENGR Engineering Final | Canceled | provide long-term bicycle locker as shown for phase 1. Remove material piles, and construction from undeveloped portion of site. And provide stabilization of undeveloped bare dirt areas. Mark 480-278-3618 | |
| 08/21/2024 | ENGR Engineering Final | Passed |