Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T21CM02748
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/07/2022 | BUILDING - FINAL | Approved | ||
01/04/2022 | BUILDING - FINAL | Not ready for Inspection | 1090 Nr No word from fire inspector at 3:15. Need fire sign off to Approve 1090 and issue C of O. Super just called fire and they said he did a drive by and didn’t talk to anyone. Fire results are not in system at 3:20 | |
01/03/2022 | BUILDING - FINAL | Partial Approval | pa Ok for TCO for main restaurant. Patio not complete with wood facade on patio, for fire sign off. |
|
01/03/2022 | BUILDING - FINAL | Not ready for Inspection | Nr No word from fire inspector at 3:15. Need fire sign off to Approve 1090 and issue C of O. Super just called fire and they said he did a drive by and didn’t talk to anyone. Fire results are not in system at 3:20. | |
11/30/2021 | BUILDING - FINAL | Partial Approval | pa Need fire approval in system. Per contractor Ted, fire is going to partial their final, pending wood facade installation on the patio. The special wood is on back order. Fire is going to allow a TCO until the facade install. 1090 wise, TCO is recommended along with the partial, with 1090 Approval ready when fire final is approved. |
|
11/17/2021 | BUILDING - FINAL | Not ready for Inspection | nr |