Inspection Status: Canceled
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2022 |
COT - RSPL - Rough Soil |
|
Canceled |
Inspection Canceled |
| 02/09/2023 |
COT - RSPL - Rough Soil |
|
Not Ready |
Approved plans not on site. |
| 02/10/2023 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
install trace wire on all new sewer lines, sewer line exiting laundry room is too shallow. 12” minimum below grade |
| 02/14/2023 |
COT - RSPL - Rough Soil |
|
Passed |
|