Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2021 |
ELECTRIC - FINAL |
|
Approved |
AP |
| 04/22/2021 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
Not ready. This inspection was submitted as a service increase on the work shop permit. The increase from 100 amps to 200 amps is for the home and a sub-panel for the work shop. TEP is unable to energize the service until the customer is able to attach a panel cover to the panel. The clearance was called in as the service should be restored when a panel cover is in place. |