Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/28/2021 |
PLUMBING - ROUGH, SOIL |
|
Approved |
1010, 2010, 3005, 1015, 1005, 3057, 1075. All are approved. |
| 03/02/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
PARTIAL GRIDLINES D.5-0.6 NORTH EAST CORNER RESTROOMS AND BREAKROOM |
| 03/02/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
PARTIAL GRIDLINE D.5-0.6 NORTH EAST CORNER RESTROOMS AND BREAK ROOM |
| 03/01/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
RESTROOM PLUMBING (TIED INTO PREVIOUSLY INSPECTED SANITARY LINES) FOR NORTH AND SOUTH GUARD HOUSES |
| 02/24/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
PARTIAL OFFICE AREA MEN'S ROOM NUMBER 118 AND 119 |
| 02/23/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
PARTIAL VENDING ROOM 112, MULTI-FAITH ROOM 123, WOMEN'S TOILETS 120 AND 121 |
| 02/12/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
PARTIAL 6 INCH MAIN FROM B 15 TO F 15. |
| 02/11/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. 6 inch main from 8E to 8G, 4 inch lateral, at approximately Gridline 8G, approximately 10 feet long going east. |
| 02/10/2021 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
Partial. 6 inch main from gridline 8A to 8E, with a 4 inch lateral going east at gridline A.5, approximately 53 feet. |
| 02/09/2021 |
PLUMBING - ROUGH, SOIL |
|
Cancelled |
CANCELLED |