Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date |
Description |
Inspector |
Results |
Comments |
| 07/28/2021 |
ELECTRIC - UNDERGROUND |
|
Approved |
1010, 2010, 3005, 1015, 1005, 3057, 1075. All are approved. |
| 02/27/2021 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
SERVICE BOX STUB-OUTS FOR NORTH AND SOUTH GUARD HOUSES |
| 02/16/2021 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial. From guard shack to the canal. Ran to number 2-4 inch and 2-2 inch. From the canal to the south and south east sections of the parking lot. |
| 02/10/2021 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial. From electrical panel located at Gridline A15.5 to E7. South electrical room turn up’s installed. |
| 02/09/2021 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial. From main electrical room G6 to column 6A, 4-4 inch pipes and from electrical room 6G to 8A, 1-4 inch, 2-2 inch and one 1-1/2 inch. |
| 02/08/2021 |
ELECTRIC - UNDERGROUND |
|
Partial Approval |
Partial. 4-4” abs 2-2” schedule 40. From main electrical room on column 1G to column 1E. |