Permit: T21CM00534


Addresses:

3550 E CORONA RD


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T21CM00534

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/28/2021 EXCAVATION/LAYOUT REBAR & ZON Approved 1010, 2010, 3005, 1015, 1005, 3057, 1075. All are approved.
03/30/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Gridline one. Wall footing pour.
03/26/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Dock leveler closure pour. Northside, grid lines 1 through eight.
03/22/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. loading dock levelers on Northside, gridlines A- 1 thru 8.

This is an after-hours inspection. please charge their APA account $165.00.
03/17/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Gridlines 9 thru 16 on North and South sides, Gridline 16 west wall.
03/16/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Slab on grade. 0.1 thru 1 and A.8 thru F.3
03/15/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Wall footing tie-in. Gridlines 1 thru 9 on the north and south sides.
03/09/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL STANDUP PANELS #81 - #100 AND #109 - #114 OK TO POUR
03/02/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL, TILT UP WALLS, 49-54.
03/01/2021 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection NOT READY NO CONTACT INFORMATION PROVIDED RECALL INSPECTION
02/27/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval TILT UP WALLS FOR NORTH AND SOUTH GUARD HOUSES
































NORTH AND SOUTH SIDE GUARD HOUSE.
02/26/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Slab on grade. Gridlines A to D and 8 to 12. Max reach unloader footing, gridlines F.5 –12 to 16.
02/25/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Light poles on north side of channel and Northeast parking lot. Footings for pump room in the north east corner. Tilt up walls 16 through 32.
02/24/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Slab on grade. Gridlines 8 to 12 and D to G. Parking lot light poles, east side parking lot and north of the channel.
02/23/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL TILT UP WALLS, #2 THRU #15
02/22/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Oh light poles on southside of channel for parking Lot. Slab on grade, gridlines 8 through D and 3 through 8. Foundation and footings in office area gridlines A.8-0.1 to F.3-0.1. D.1-0.1 to D.1-0.6. Footings on gridline 0.6- B.6, C.3, D.1, E, E.7.
02/19/2021 EXCAVATION/LAYOUT REBAR & ZON Cancelled
02/18/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Tilt up walls numbers 67 through 80 and number one.
02/17/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Foundation and footings from gridlines A-1 to A.8-1 to A.8-0.1 to C.3-0.1.
02/16/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. Tilt up walls numbers 55 through 66. Footings from gridlines D1 to G1.
02/12/2021 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
02/11/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. From G – 16 to C – 16, west wall. From A16 to A1, north wall
02/09/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. 5 F-3 footings, lower pour OK, perimeter footing from Gridline G8 to G16.
02/08/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Partial. F1 interior footings. Gridlines 9 thru 15 and B thru F.
02/05/2021 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PARTIAL F1 INTERIOR FOOTINGS. GRIDLINE COLUMNS 2 THRU 7 AND B THRU F