Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T21CM00534
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/28/2021 | EXCAVATION/LAYOUT REBAR & ZON | Approved | 1010, 2010, 3005, 1015, 1005, 3057, 1075. All are approved. | |
03/30/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Gridline one. Wall footing pour. | |
03/26/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Dock leveler closure pour. Northside, grid lines 1 through eight. | |
03/22/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. loading dock levelers on Northside, gridlines A- 1 thru 8. This is an after-hours inspection. please charge their APA account $165.00. |
|
03/17/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Gridlines 9 thru 16 on North and South sides, Gridline 16 west wall. | |
03/16/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Slab on grade. 0.1 thru 1 and A.8 thru F.3 | |
03/15/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Wall footing tie-in. Gridlines 1 thru 9 on the north and south sides. | |
03/09/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL STANDUP PANELS #81 - #100 AND #109 - #114 OK TO POUR | |
03/02/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL, TILT UP WALLS, 49-54. | |
03/01/2021 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | NOT READY NO CONTACT INFORMATION PROVIDED RECALL INSPECTION | |
02/27/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | TILT UP WALLS FOR NORTH AND SOUTH GUARD HOUSES NORTH AND SOUTH SIDE GUARD HOUSE. |
|
02/26/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Slab on grade. Gridlines A to D and 8 to 12. Max reach unloader footing, gridlines F.5 –12 to 16. | |
02/25/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Light poles on north side of channel and Northeast parking lot. Footings for pump room in the north east corner. Tilt up walls 16 through 32. | |
02/24/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Slab on grade. Gridlines 8 to 12 and D to G. Parking lot light poles, east side parking lot and north of the channel. | |
02/23/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL TILT UP WALLS, #2 THRU #15 | |
02/22/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Oh light poles on southside of channel for parking Lot. Slab on grade, gridlines 8 through D and 3 through 8. Foundation and footings in office area gridlines A.8-0.1 to F.3-0.1. D.1-0.1 to D.1-0.6. Footings on gridline 0.6- B.6, C.3, D.1, E, E.7. | |
02/19/2021 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | ||
02/18/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Tilt up walls numbers 67 through 80 and number one. | |
02/17/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Foundation and footings from gridlines A-1 to A.8-1 to A.8-0.1 to C.3-0.1. | |
02/16/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. Tilt up walls numbers 55 through 66. Footings from gridlines D1 to G1. | |
02/12/2021 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | ||
02/11/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. From G – 16 to C – 16, west wall. From A16 to A1, north wall | |
02/09/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. 5 F-3 footings, lower pour OK, perimeter footing from Gridline G8 to G16. | |
02/08/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Partial. F1 interior footings. Gridlines 9 thru 15 and B thru F. | |
02/05/2021 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PARTIAL F1 INTERIOR FOOTINGS. GRIDLINE COLUMNS 2 THRU 7 AND B THRU F |