Permit: T21CM00391

Parcel: 138040610


Addresses:

858 W CALLE LERDO

Inspection Status: Canceled

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
11/04/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled Inspection Canceled
03/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 3-4-25, submit revisions for framing -provide details for lintel in living room& HVAC, add firefoam all penetrations at top plates, DWV must be under pressure, add strap to DWV, add nailing to exterior sheathing -6 inches along edges and 12 " in the field. Avoid over penetrating nails-crown of nails to be flush with sheathing.
08/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled 8/26/24: Canceled by Gabriel
09/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 8/26/24: Canceled by Gabriel
9/3/24: no approved plans on site.
09/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 8/26/24: Canceled by Gabriel
9/3/24: no approved plans on site.
9/5/24: revision required for electrical,mechanical and framing changes being made.