Inspection Status: Passed
Inspection History: COT - LCBU - Masonry Pregrout
| Date |
Description |
Inspector |
Results |
Comments |
| 03/26/2021 |
COT - LCBU - Masonry Pregrout |
BSTEVENS |
Approved |
Entered by BSTEVENS - OK TO TOP OF WALL |
| 03/01/2021 |
COT - LCBU - Masonry Pregrout |
DQUINN |
Partial Approval |
Entered by BSTEVENS - PARTIAL - North wall ok to grout to top. Verts and horizontals for bond and ledger bolts ok |
| 02/26/2021 |
COT - LCBU - Masonry Pregrout |
ESTEVENS |
Approved |
Entered by BSTEVENS - PARTIAL GROUT 4TH LIFT 12 TO 16 FEET |
| 02/25/2021 |
COT - LCBU - Masonry Pregrout |
KCOCO |
Partial Approval |
Entered by BSTEVENS - PARTIAL APPROVAL FOR NORTH WALL 3RD LIFT |
| 02/24/2021 |
COT - LCBU - Masonry Pregrout |
ESTEVENS |
Cancelled |
Entered by VLEON1 - CANCELLED BY CONTRACTOR |
| 02/23/2021 |
COT - LCBU - Masonry Pregrout |
KCOCO |
Partial Approval |
Entered by BSTEVENS - FIRST LIFT TO BOND BEAM AT TOP OF STEM AND AT WINDOW SILLS.
2ND LIFT FOR NORTH WALL ONLY |