Inspection History Details
Inspection Status: Partial Approval
Inspection History: POOL/SPA FINAL/BARRIER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2022 | POOL/SPA FINAL/BARRIER | Partial Approval | PA. Need to bond other side of gate. Sent text at 7:49 9:00 |
|
| 03/10/2022 | POOL/SPA FINAL/BARRIER | Approved | AP Sent text at 7:49 9:00 | |
| 01/06/2022 | POOL/SPA FINAL/BARRIER | Denied | DE. Bond wrought iron within 5’ of pool. | |
| 12/20/2021 | POOL/SPA FINAL/BARRIER | Denied | DE. 1-Bury gas line. 2-Bond wrought iron within 5 feet of pool. | |
| 11/12/2021 | POOL/SPA FINAL/BARRIER | Partial Approval | Partial approval need electrical whips installed out of the dirt and secured to the wall |