Inspection History Details
Inspection Status: Passed
Inspection History: TRSP - ROW - Recurring
Permit Number - T20RW04758
Inspection Description - TRSP - ROW - Recurring
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/06/2021 | TRSP - ROW - Recurring | Passed | TDOT-EXCAV GENERAL INSPECTION - Project completed. All equipment for tower installed. Two sidewalk panels replaced. All work performed in dirt shoulder. Roadway not affected. Landscape shoulder around tower repaired to original condition. Light arm installed. Power source for this tower is from existing street light. Sink hole filled in. Permit closed. | |
04/06/2021 | TRSP - ROW - Recurring | Passed | TDOT-Routine Barricade Inspect - Traffic control devices have been removed from site. | |
03/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - All items installed. Light arm installed on pole. All work performed in dirt shoulder. No sidewalk in area. Roadway repaired at conduit run for power. A sinkhole has developed next to one of the boxes in the dirt shoulder. Notified contractor. Also notified contractor of barricades that need to be picked up. | |
03/30/2021 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control devices removed from roadway, staged for set up/pickup. | |
11/12/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - New pole and footing installed. All boxes installed. Two sidewalk panels replaced. Equipment is still required to be installed on pole. Landscaping in shoulder replaced. | |
11/12/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued | |
11/06/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pole foundation placed. Sections of existing sidewalk removed and in the process of being replaced. Forms set. | |
11/06/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Continued | |
10/28/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Old pole and footing removed. Sections of sidewalk removed. New poll being formed up. | |
10/28/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Traffic control set up to close northbound right lane. | |
10/14/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-EXCAV GENERAL INSPECTION - Pre-con meeting at 9 AM. Discussed location of pole, replacing the sidewalk panel, adjustment of grade behind pole and boxes, reinstalling the riprap to conform to change of grade around site. | |
10/14/2020 | TRSP - ROW - Recurring | Re-inspection required | TDOT-Routine Barricade Inspect - Not Ready for Inspection. Pre-con meeting at 9 AM. |