Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | CoVid slow Street project 22nd St. & Tucson Blvd, T20 RW04618 contractor Border Traffic need clarification where to install speed hump signs and PVC markers was asked per engineer Blanca to help out. | |
| 10/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | all speed humps have temporary striping | |
| 10/08/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | speed humps were installed on October 7, 2020 Address 2632 and 2502 Warwick Vista also at address 2650 and 2712 Keswick Circle bump signs are installed area is clean no issues | |
| 10/06/2020 | TDOT-EXCAV GENERAL INSPECTION | Continued | CoVid Slow Streets contractor KN&G has installed speed hump at 2514 E. 23rd St. proper traffic control signage is up flaggers are on site work area is clean Second speed hump being installed at 2714 E. Crosby St. proper signage and traffic control in place no issues address 2701 E Warwick Vista speed hump installed |