Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | ||
| 09/03/2020 | TDOT-EXCAV GENERAL INSPECTION | Approved | Precon was held on site Contractor removed and replaced sidewalk and driveway apron. Sidewalk was done in exposed agg. to match existing. Sidewalk and apron had rebar added, ABC and was poured 8 in. Area is used for trash roll off. No issues or repairs needed. Contractor went above city standards |