Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/04/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Thermo striping complete. No further concerns. |
| 07/21/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor cleaned ROW and staging area. Waiting on thermo. |
| 07/20/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Patch complete and acceptable. Opened to traffic. Contacted contractor for better cleanup in ROW area and in the parking lot where equipment was stored. Waiting on thermo striping. |
| 07/16/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Milled and filled. Temp striping.. |
| 07/15/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Cleaning up. Contractor painted out mill and fill limits. |
| 07/14/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Backfilled and patched. Still need to mill athe asphalt for proper patch. |
| 07/13/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Continue main repair. |
| 07/10/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Continue main repair. |
| 07/09/2020 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Continuing repairing water main. |